Saturday, 17 January 2015

Big Move

It was very cold last night, quite a heavy frost this morning but I didn’t realise until I looked outside, I think the boat is finally drying and warming through, the wise mooring monitor at Brentford said to me “ I light the stove in October and it does not go out until April” and I think he’s got the right idea, even though some days are warm the evenings are not and letting it go out and relighting it is really just a waste of effort, the boat cools and takes longer to get warm again, so mine’s staying on now ‘til summer.

Today I had to move, I was on 24 hour moorings so I made the effort and moved about 80 feet across the canal to the tow path side, I can moor there for another 13 days (it’s 14 days normally but that’s in the same “area” so technically I have 13 left).

I walked to Hayes Bridge retail estate to visit Halfords for some bits, it’s about a 40 minute walk away, the 1st 10 minutes were alongside the very busy A312, it was noisy and cold but then I went through Minet Country Park, they’ve got a fantastic cycling facility there, Hillingdon Cycle Circuit, it’s like a road track but for cycles only, quite challenging I would imagine, with hills and fairly tight bends, it was very busy, all the young kids in their lycra with expensive looking bikes ages probably started from as young as 3 up to adults. I doubt many car drivers even know it’s there.

When I got back to the boat I did a more permanent repair on the tunnel light and horn which I had previously done an emergency bodge on, I also fitted an on/off switch to the little charging outlet I had previously fitted, it has a blue LED to show it’s working which was lit all the time and driving me mad, so now I can switch it off.

Time to start dinner, I am cooking a Lamb Pilau, should be interesting.


Totals today : 0 Locks : about 80 feet J

No comments:

Post a Comment