Friday, 20 January 2017

Icy mornings but more progress.....

......only on the project, not along the canal.

On Monday afternoon I went along to Screwfix which is only about a 15minute walk away and collected the bits and pieces I needed.

On Tuesday I began work, I had decided to utilise the void where the washing machine had come from by making up a drawer unit to fit into it and re-using the drawers that were formally in the galley, it’s all about recycling J

This is the void I had to work in.


Having made a skeleton unit and fitted the drawers into it on soft close runners I then dismantled it all and rebuilt it in-situ as I could not get it into position as a complete item.

It was then a case of making up a frontage to reduce the opening to the correct size and fitting that along with a shelf above it, refitting the skirting board and other cover fillet alongside the basin.

I also formed a small tiled splash-back around the basin.

The end result looks like this.

Quite pleasing I think.

I don’t like cups and screws particularly but I have used them rather than pellets so that things are easier to de-mount should the need arise, very likely on a boat!

I still have to sort out some finishing’s, varnish and cover fillets on the ceiling but that can wait until I regain my enthusiasm!

The canal has been frozen for the last 3 mornings and I am not tempted to move on yet, I also have a personal matter to attend to, the timing of which will affect my plans and as yet is unknown.


So with Waitrose almost alongside my boat and the town within 2 minutes I am happy to remain for possibly the full 14days if necessary. I have all I need for now.